126a High Street Old Woking Surrey GU22 9JN Tel;- 01483 750074 Fax:- 01483 751995
Testing 1303
INTEGRITY TEST CERTIFICATE OF FOUNDATION PILES For Hill Piling Ltd REPORT: TCSL – 6197. Visit 07 CLIENT:
Hill Piling Ltd Unit 1 Springfield Industrial Estate Springfield Road Burnham-on-Crouch Essex CM0 8UA
SITE ADDRESS :
Durkan Union Road Clapham London SW4 6JG
DATE OF TESTING:
October 10th, 2013
No: PILES TESTED:
5
PERFORMED BY:
Christian Doe
PILE TYPE:
350mm nominal diameter continuous flight auger (CFA) piles
PILE LENGHTS:
10.7 to 23.6 from final level
PILES TESTED:
Block C: P111, P118, P135, P136, P146.
CONCLUSION OF RESULTS The interpretation of the recorded test traces indicate that of the 5 piles tested no major defects have occurred within the material of the pile shafts during their construction, therefore, the piles are considered to be of a reliable integrity throughout their length with no significant changes in cross-sectional area.
Date Reported: October 14th, 2013
Checked By:………………… . Barry Shirley Operations Manager