Ensuring Process Safety & Asset Integrity Leveraging Plant Asset Information Adrian Park Vice President, SmartPlant Enterprise Solutions, Intergraph Process, Power & Marine
Progressive Safety and Asset Management Standards
1992 U.S. Occupational Safety and Health Administration OSHA 29 CFR1910 119
2007 Center for Chemical Process Safety CCPS
© 2015. Intergraph Corporation. All Rights Reserved.
2008 British Standards Institute PAS55 Adopted as ISO 55000 in 2014.
2010 UK Energy Institute
2011 U.S. Bureau of Ocean Energy Management BOEMRE 30 CFR Part 250, Subpart S
Importance of Asset Life-cycle Information for Asset Integrity
Management of Change
Process Hazard Assessment
Asset information that is…
Accurate & Validated Consistent & Complete
Accessible & Secure Timely & Actionable
Asset Lifecycle Information Management System
Compliance Audits
Operating Procedures
©2015 Intergraph Corporation. All Rights Reserved.
59% see trustworthy information critical for Process Safety Mgt. and 47% for Asset Integrity Mgt. 54% see trustworthy information critical for Turnarounds, Shutdowns etc. 62% see trustworthy information critical for supporting Maintenance & 65% see trustworthy information Reliability critical for Modifications, Revamps and Maintenance Changes
©2015 Intergraph Corporation. All Rights Reserved.
TechValidate Survey Results
Only 39% were completely confident in their ability to find information to support an emergency situation!
SOURCE: TechValidate survey of professionals in process industries (March 2014)
©2015 Intergraph Corporation. All Rights Reserved.
Extracting Value from Engineering Information – A Significant Opportunity –
Reduce OPEX
Increase Uptime
Shorten Project Schedule
Virtual Asset
Reduce CAPEX
Physical Asset © 2015. Intergraph Corporation. All Rights Reserved.
Minimize Health & Safety Risks
Ease Demonstrable Compliance
Achieving Asset Integrity – Enabling Integrity / Safety Relevant Work Processes – Project Management of Change
CMMS Building
Alarm & Set Points Management
Small Projects Engineering
Interface Management
Site Receipt Verification
Operating Procedures
Plant Management of Change
Non-conformity Management
Pre-start-up Safety Checks Installation Qualifications
Plant Staff Training
DCS Change Management
Technical / Site Query Management
Operational Qualifications
Turnaround Planning
Model / Asset Management
Risk Management (ALARP / ALARA)
Mechanical Completions
Piping Inspection Instrument Calibration
Maintenance Planning
Requirements Management
Commissioning
Design Integrity
Intelligent Plant Manuals
HAZOP
Preservation Management
Lock-out / Tag-out
Inspection Inspection Planning Planning/Records
CAPEX/OPEX Projects
Operational Readiness
Operations & Maintenance
Eng. Registers & Lists
Documents & Transmittals
Work Breakdown Structure & Packages
Plant Breakdown Structure
Vendor Data
Information Validation & Transformation
Legacy Information Capturing
Information Handover
Lifecycle Information Management © 2015. Intergraph Corporation. All Rights Reserved.
Achieving Asset Integrity – Enabling Integrity / Safety Relevant Work Processes – Project Management of Change
CMMS Building
Alarm & Set Points Management
Small Projects Engineering
Interface Management
Site Receipt Verification
Operating Procedures
Plant Management of Change
Non-conformity Management
Pre-start-up Safety Checks Installation Qualifications
Plant Staff Training
DCS Change Management
Technical / Site Query Management
Operational Qualifications
Turnaround Planning
Model / Asset Management
Risk Management (ALARP / ALARA)
Mechanical Completions
Piping Inspection Instrument Calibration
Maintenance Planning
Requirements Management
Commissioning
Design Integrity
Intelligent Plant Manuals
HAZOP
Preservation Management
Lock-out / Tag-out
Inspection Inspection Planning Planning/Records
CAPEX/OPEX Projects
Operational Readiness
Operations & Maintenance
Eng. Registers & Lists
Documents & Transmittals
Work Breakdown Structure & Packages
Plant Breakdown Structure
Vendor Data
Information Validation & Transformation
Legacy Information Capturing
Information Handover
Lifecycle Information Management © 2015. Intergraph Corporation. All Rights Reserved.
Enables Process Safety Management Programs OSHA 29 CFR1910 defines 14 elements 1.
Employee Participation
SPO
2.
Process Safety Information
3.
Process Hazard Analysis
4.
Operating Procedures
5.
Training
SPO Tag/Doc Mgt SP Process Safety Electronic Dossiers
3D Pact Training
Contractor Portals
SPO Tag/Doc Mgt
3D Pact Training
6.
Contractors
7.
Pre-Startup Safety Reviews
8.
Mechanical Integrity
9.
Non-routine Work Authorization (Lock Out/Tag Out)
Systems Completions
Inspection Assistant
Permit to Work
Via third party
SPO
12. Emergency Planning & Response 13. Compliance Audits 14. Trade Secrets
Lock/Out Tag/Out
Mgmt of Plant Change
10. Management of Change 11. Incident Investigation
Design Rules
Effectivity
3D Pact Training Workflows
SPO Tag/Doc Mgt NonConform Mgmt
Data Access Control
© 2015. Intergraph Corporation. All Rights Reserved.
9
Asset Lifecycle Information – Tree Structure and Registers
Plant Breakdown Structure
Document Classification
Discipline Structure
Organization Structure
Tag Classification
PSI and Safety Critical Equipment Registers
© 2014 Intergraph Corporation. All Rights Reserved. PSI Categories
PSI Documentation
Vision vs. Reality
Trusted Source
© 2015 Intergraph Corporation. All rights reserved.
Reality
!
TechValidate Survey Results
40% or more of information in plant is unstructured
SOURCE: TechValidate survey of professionals in process industries (March 2014) © 2015 Intergraph Corporation. All rights reserved.
Asset Lifecycle Information Handover Physical Asset
Project Mgmt. of Change Intelligent Laser Scan Mon-conformity Management Scan Based Modeling
i
Technical / Site Queries CMMS Building
Legacy Asset Information SP Fusion
System Completions
SPO/E Smart Data Validator
HAZOP Owner Operator Business Processes
i Projects / Suppliers (SPE)
Plant Mgmt. of Change SPO/E Handover Lock-out / Tag-out
i
Turnaround Planning
Projects / Suppliers (no SPE)
Maintenance & Inspection Planning Document Management Operating Procedures
SmartPlant Enterprise for Owner Operators © 2015 Intergraph Corporation. All rights reserved.
SPO/E Smart Data Validator
i
SmartPlant Fusion – Extracting Intelligence from Legacy Documents
Pump P-7701B Up and running DUPLICATE
1
2
3
4
Weeks
Rapid Capture
Identify Masters
© 2015 Intergraph Corporation. All rights reserved.
Extract Intelligence
Quality Control
Link & Cross Reference
Intuitive Single Point of Access
Save time
Less exposure to on-site risk Improve collaboration
© 2015 Intergraph Corporation. All rights reserved.
Validation from Multiple Sources
OO / PMC
Legacy Systems
Target Systems
Report
Approve
i Transform
EPC Contractors
Validate
Syntax Rules (ENS) Uniqueness validation Relationship cardinality Date/Time validation Integer validation String validation Pick-List validation Unit of Measure validation Mandatory fields Cascading errors
SPO in the Enterprise IT Landscape Asset Performance Management
Enterprise Content Management Enterprise Asset Management
Significant investment
SPO Plant Automation Systems
HSE Systems ©2015 Intergraph Corporation. All Rights Reserved.
BUT… systems Established knowledge base operate in silos
Asset Integrity Management
Management of Change in SPO Operating Plant
Create Change Request • •
Relate to affected objects Initiate workflow
SPO
Review • •
Change Board Review Discipline Review
SAP EAM
Approve/Reject • •
Approve for Engineering Approve for Implementation
Implementation • • •
Complete Engineering Implement as Notification or Turnaround As-built update
© 2015 Intergraph Corporation. All rights reserved.
Implementation • •
Notification Job Package for Turnaround
Synchronization of design basis with SAP
Filtration and Transformation
Tag Creation, Update or Termination
i
Create / Update FL record
i
SPO
NetWeaver PI
SAP
EAM
Tag
Tag FL EQ Relationships
i
Equipment Install / Dismantle
Generic process enabling synchronization with any third party system © 2015 Intergraph Corporation. All rights reserved.
Synchronizaton with SAP
SPO
–Synchro - nisation
© 2015. Intergraph Corporation. All Rights Reserved.
SAP
Engineering Information for Asset Integrity Management – Summary & How to get started –
Engineering Information Management is a key enabler for Safety and Asset Integrity Management Asset Lifecycle Information Management represents a big opportunity for you Do you know where you stand?
© 2015. Intergraph Corporation. All Rights Reserved.
We will help you to improve: • •
Step by step Fast Track
SAFETY.
QUALITY. PRODUCTIVITY.